MDC Unit 4

Client Peter Tew Chartered Surveyors
Contract value £153,000
Date September 2013
Status Complete

Brief
Hoyes Roofing & Cladding competed successfully for a tender to carry out the refurbishment of Midlands Distribution Centre Unit 4. This project included stripping the original asbestos roof, side wall, barge boards and rain water goods. Asbestos removal was carried out in house by UKATA trained personnel.

• The roofing and cladding package was a Kingspan RW 115mm insulated panel with 10% roof lights.
• All flashings and rainwater goods were installed at 6m lengths in Sigasso blue.
• The gutter to the elevation which ajoins the existing building was lined with a seamless plygeen gutter liner.

All the above was completed within a 6 week timescale as per the clients specification.